91正在播放I99精品欧美一区二区蜜桃免费I久久不射网站I国产一区播放I亚洲成av人片在线观看香蕉I手机成人avI亚洲精品视频在线看I99精品视频中文字幕

400-6388-667Food/Pharmaceutical/Cosmetic/Mechanical domain experts

homeother product details

Stainless steel gas stove pot large cooker wok gas food mixing pot

Release date:[2017-03-11]     Click rate:

main feature:

1, full combustion, smoke-free dust, a small amount of carbon deposition, no environmental pollution.

2, the flame temperature free to adjust the temperature up to 300 ℃ or so.

3, the structure is reasonable, easy to use.

4, strong energy, fire and fire, thermal efficiency than similar products increased by 25%.

5, fuel: liquefied petroleum gas, pipeline gas, natural gas, the use of oil is strictly prohibited.

6, air consumption: than similar products by about 20%.


overview
parameter

Gas sandwich pot with a large heating area, high thermal efficiency, heating evenly, material boiling time is short, easy to control the heating temperature and so on.


main feature:

1, full combustion, smoke-free dust, a small amount of carbon deposition, no environmental pollution.

2, the flame temperature free to adjust the temperature up to 300 ℃ or so.

3, the structure is reasonable, easy to use.

4, strong energy, fire and fire, thermal efficiency than similar products increased by 25%.

5, fuel: liquefied petroleum gas, pipeline gas, natural gas, the use of oil is strictly prohibited.

6, air consumption: than similar products by about 20%.

skills:

1, remove the heater, put the gas fire cover.

2, open the valve and intake interface.

3, counterclockwise to open the valve, open fire lit. (With a fire stove please ignite the fire).

4, while adjusting the throttle and valve switch, until the required flame.

5, stop working, close the angle valve and valve.

Precautions:

1, regularly check the sealing of the joints.

2, regularly check the stove, forbidden dirt to plug the stove plug.

3, when the first tilt when the steam, after the speed control switch.

maintenance:

1, into the steam pipe and outlet pipe leakage, elected tight nuts do not solve the problem, you should add or replace the filler.

2, the pressure gauge and safety valve should be regularly checked, if the failure of timely replacement and repair.

3, the gear box to start using after 50 hours, should be removed to let go of lubricants, rinse with kerosene or diesel, add 30 # - 40 # clean oil, use 150 hours after the second oil change, after the specific circumstances , Each used to 1000 hours or so oil change once.

4, anti-rust oil peeling, should be timely brushing, painted outside the pot of paint, it is recommended to use X55-3 aluminum powder water resistant paint.

5, the pot used after 5 years, the proposed safety of water pressure test, after the interval of water pressure test, according to the requirements of technical departments around. Water pressure test pressure P water according to the following circumstances: When the rated working pressure P <0.6MPa, P water = 0.15MPa; when the rated working pressure P = 0.6-0.8MPa, P water = P + 0.3MPa

6, the pot outside the pot body using 4.0 ~ 5.5 mm thick steel plate manufacturing, steel A3, when the outer pot after years of corrosion reduced to 2mm below, should stop using. 7, the pot of stainless steel welding and other stainless steel welding joints, should be used stainless steel electrode 102, Austrian 107, Austria 132, Austria 137, should not use other grades.

Use Note:

1, should use liquefied petroleum gas, pipeline gas, natural gas and other fuels, prohibited the use of oil;

2, connected to the stove hose and the furnace end and the valve end to be tightened, and should be naturally under the stove surface sagging, and maintain the distance of 10 cm or more, so as not to be fire scorched, resulting in an accident;

3, do not install the gas heating sandwich pot in the room, and then use the coal stove, liquefied petroleum gas or other stoves;

4, gas heating around the sandwich pan do not stack flammable items;

5, with the gas field must ensure that spacious and well ventilated;

6, gas heating sandwich pan when the ignition gas to be someone to take care of;

7, people go to turn off;

8, found that leakage or abnormalities to quickly close the valve to open the doors and windows ventilation;

9, before the break to check the gas valve and the front of the switch is closed.

Installation procedures:

1, tighten the bracket of the two set screws, shake the pot body, both ends of the inlet pipe and outlet pipe is not allowed to rotate with the pot.

2, the installation is completed, the mixing-type sandwich pot, should be empty test run test, until the transmission parts of the normal operation before they can be put into use.

3, after the air, such as joints at the leak, you can tighten the nut until the leak so far.


Contact us

Learn more about our detailed information, please contact
400-6388-667

Or leave a message to us

主站蜘蛛池模板: 激情文学丁香 | 免费观看视频的网站 | 久操视频在线观看 | 久草网站在线 | 日韩精品视频免费在线观看 | 色九九在线 | 久久不卡日韩美女 | 日本丶国产丶欧美色综合 | 六月天综合网 | 久久永久免费视频 | 久久成人在线 | 国产成人黄色 | www日韩在线 | 久久精品这里精品 | 成年人视频在线免费观看 | 99久久99热这里只有精品 | 99久久久成人国产精品 | 国产成年人av | 91精品欧美 | www.黄色在线 | 亚洲成a人片在线观看网站口工 | 在线观看 国产 | 中文字幕 成人 | 欧美在线a视频 | 亚洲码国产日韩欧美高潮在线播放 | 蜜桃av久久久亚洲精品 | 成人a视频在线观看 | 色综合天天在线 | 欧美精品中文在线免费观看 | 国产精品一区二区三区99 | 欧美亚洲精品一区 | 日韩精品一区二区三区免费视频观看 | www.99热精品 | 亚洲最新毛片 | 亚洲经典中文字幕 | 毛片网站免费在线观看 | 日韩小视频网站 | 国产一区二区在线免费 | 亚洲九九精品 | 欧美一区二区精品在线 | 日韩在线观看小视频 | 蜜桃av人人夜夜澡人人爽 | 亚洲午夜精品一区二区三区电影院 | 国产综合精品一区二区三区 | 91在线超碰 | 99久久久国产精品免费99 | 国产午夜精品一区二区三区欧美 | 亚州精品成人 | 婷婷综合激情 | 在线观看国产一区二区 | 天天操天天综合网 | 成人av视屏 | 欧美成人影音 | 高清av中文字幕 | 亚洲视频www | 久久久精品成人 | 久久久www成人免费精品张筱雨 | 国产精品一区二区久久 | 色婷久久| 国产亚洲综合在线 | 精品国产自在精品国产精野外直播 | 在线视频国产区 | 欧美成a人片在线观看久 | 国产成人在线免费观看 | 久久精品99久久久久久2456 | 91mv.cool在线观看 | 黄网站色成年免费观看 | 91传媒激情理伦片 | 日韩午夜在线播放 | 免费看的黄网站软件 | 人人插人人干 | 天天干天天天 | 欧美aaaxxxx做受视频 | 久久免费看av| 成人免费一区二区三区在线观看 | 新av在线 | 国产精品一区二区中文字幕 | 欧美日韩国产在线一区 | 久久精品xxx | 日韩欧美99 | 中文字幕av在线免费 | 美女网站在线看 | 婷婷丁香导航 | 五月天亚洲婷婷 | 日韩视频1| 久久免费a| 热久久最新地址 | 91夫妻视频 | 久草网在线 | 久久老司机精品视频 | 亚洲精品中文在线观看 | 在线日韩av | 久久在线影院 | 精品亚洲国产视频 | 欧美黄色特级片 | 免费看污污视频的网站 | 久久久久久免费视频 | 中文字幕视频在线播放 | 久久久久日本精品一区二区三区 |